Completed in 2025, The Bridge Tower is a 174 m office development in Warsaw that unites a new high-rise with the renewal of the historic Bellona building, a former printing house and protected monument. Organised around a glazed shared lobby, the project connects heritage and contemporary workplace design through 47,000 m² GLA of flexible office space, integrated amenities, adaptive planning, and a low-impact strategy powered by 100% clean energy.