According to the local urban planning regulation related to U.T.R. 4, UTR 4_22 (mixed sub-zone with buildings with continuous or discontinuous construction regime and maximum heights of P+4-5 withdrawn)
takes over the regulations of PUZ Sos. Nordului.According to the latter PUZ, the studied location is included in the M3m subzone – mixed subzone with buildings having a continuous or discontinuous construction regime
Approved functions: homes, office.