ELLINIKON HEALTH SCIENCES CAMPUS

buerger katsota architects IKE

/

Completed Projects – Adaptive. Retrofit

/

Greece

Company Name

buerger katsota architects IKE

 

COMPANY COUNTRY:

Greece

ARCHITECTURAL CREDITS

buerger katsota architects, Michael Cosmas Architects

Project Team
Design Team bka: Stephan Buerger, Demetra Katsota, Katerina Droukopoulou, Ilias Antoniou, Nikolina Mitrou, Isavella Oikonomopoulou, Panos Rigopoulos, Kostis Terzidis. Hill International (project management), EBLECTON (structural engineers – reinforcement), ASME (structural engineers), Samaras & Associates (mechanical engineers), Spatial Labs (facade engineering), Danilof Studio (lighting design), Theodoros Timagenis (acoustic engineer), Livingscapes (landscape design), DCarbon (sustainability consultants), SeCon (security consultants), ALA (audio visual consultants).
CLIENT OR OWNER NAME:

University of Nicosia

Project Name:
ELLINIKON HEALTH SCIENCES CAMPUS
Project Country:

Greece

Project City:
Athens
Project Category:
Adaptive. Retrofit
Project Area:
12.500
Completion Date:
2025-11-01
Project overview

The UNIC Medical School transforms the former Olympic Airways data centre into Greece’s first private medical university through adaptive reuse. Completed in under 20 months, the LEED-certified retrofit preserves and strengthens the existing structure while creating flexible teaching, clinical, laboratory and social spaces. The project delivers a cost-efficient, sustainable solution that maximizes the value of the existing building while meeting contemporary educational needs with a 22M budget.

Project history
UNIC sought to establish the first private medical university in Greece while demonstrating the value of adaptive reuse within the emerging Ellinikon district. Rather than demolish the former Olympic Airways data centre, the client chose to transform it into a contemporary academic campus, preserving its structural framework and reducing environmental impact. From project initiation to operation, the development was completed in less than 20 months, enabling the Medical School to open on schedule. The new campus delivers flexible teaching spaces, clinical simulation facilities, laboratories, a library and student amenities that support modern medical education. As one of the first completed projects bordering The Ellinikon Development, it has become a catalyst for regeneration, extending the life of a significant building, strengthening the area’s educational identity and creating lasting value for students, faculty and the wider medical and science community.